Colorado Boulevard Multimodal Study

Yellow Street Lines on Asphalt

During the spring, the project team completed the Colorado Boulevard Existing Conditions Report which included a detailed summary of existing land use, zoning, and trail facilities as well as a summary of previous studies. Roadway elements and average daily traffic data along the corridor were collected and evaluated to determine locations where projects could improve multimodal connections and safety. This report also summarized community input from an online survey which reflected the public’s needs and concerns about the corridor.

Traffic Engineering Services (TES) and the project consultant presented the study recommendations to City Council on March 1, 2021. City Staff is in the process of finalizing these recommendation and anticipates them being included in the Transportation Master Plan update.

A map of the study area is included below:

map of study area

Project Updates

Sign-up to receive project news and updates.


To stay connected about the project, please contact Rolando Melgoza at 303-325-8000 or rmelgoza@centennialco.gov. Please submit Media Requests online.